The network layer provides services to the transport layer.It can be based on either( ). In both cases, its main job is ( )packets from the source to the destination.
In network layer, subnets can easily become congested, increasing the delay and ( )for packets.Network designers attempt to avoid congestion by proper design.Techniques include ( ) policy, caching, flow control, and more.
The next step beyond just dealing with congestion is to actually try to achieve a promisedquality of service.The methods that can be used for this include buffering at the client, trafficshaping, resource ( ), and admission control.Approaches that have been designed forgood quality of service include integrated services (including RSVP), differentiated services, and MPLS.
问题1选项
A.virtual circuits or datagrams
B.TCP or UDP
C.TCP or IP
D.IP or ARP
问题2选项
A.dealing with
B.routing
C.sending
D.receiving
问题3选项
A.lowering the throughput
B.lowering the correctness
C.lowering the effectiveness
D.lowering the preciseness
问题4选项
A.abandonment
B.retransmission
C.checksum
D.synchronism
问题5选项
A.distribution
B.guarantee
C.scheme
D.reservation
答案: A、B、A、B、D。
网络层为传输层提供服务,它基于虚电路或数据报方式,其主要工作是对源节点的包进行路由选择,转发到目的节点。
在网络层,通信子网很容易出现拥塞,导致包的延迟增加、吞吐率降低。网络设计者试图通过良好的设计避免拥塞,所使用的技术包括重传策略、缓冲策略和流控制等。
仅仅处理拥塞是不够的,下一步的目标是试图达到设定的服务质量。可以使用的方法有客户端缓存、通信量整形、资源预留和接纳控制等。已提出的、较好的服务质量控制方法有集成服务(包括RSVP)、区分服务和MPLS。
( )is that it provides guidance and direction on how quality will be managed and verified throughout the project.
( )the process of determining,documenting,and managing stakeholder needs and requirements to meet Project objectives.
The information security management system preserves the confidentiality,integrity and availability of information by applying a( ).
( )is a decentralized database,ensure that the data will not be tampered with and forged.
( )puts computer resources on the web,and must meet the requirements of super capacity,super concurrency,super speed and super security.
分配甲、乙、丙、丁四个人去完成五项任务。每人完成各项任务时间如表所示。由于任务多于人数,故规定其中有一个人可兼完成两项任务,其余三人每人完成一项。为了花费时间最少,( )应该完成两项任务。
已知某公司生产AB两种产品,其中生产1件A产品需要1个单位的甲资源,3个单位的丙资源;生产1件B产品需要2个单位的乙资源和2个单位的丙资源。已知现有甲乙丙三种资源4个单位、12个单位和18个单位。通过市场预测,可知A产品的单位市场利润为2元,B产品的单位市场利润为5元。该公司获得最大的市场利润应生产A产品(68)件,此时(69)资源仍有剩余。
已知某公司生产AB两种产品,其中生产1件A产品需要1个单位的甲资源,3个单位的丙资源;生产1件B产品需要2个单位的乙资源和2个单位的丙资源。已知现有甲乙丙三种资源4个单位、12个单位和18个单位。通过市场预测,可知A产品的单位市场利润为2元,B产品的单位市场利润为5元。该公司获得最大的市场利润应生产A产品(68)件,此时(69)资源仍有剩余。
某项目2016年投资额12万元,2018年开始取得项目的净收益(产品一原料辅料及公用工程)6万元/年,2018-2021年每年还会产生其他成本(包括人员工资、管理成本、制造成本等)1.1万元/年;増值税0.35万元/年、营业税金及附加0.05万元/年。则该项目的静态投资回收期为(66)年,截止到2021年底该项目的投资收益率是(67)。
安全审计的手段主要包括( )。