Information systems planners in accordance with the specific information system planning methods developed information architecture.Information Engineering follow()approach,in which specific information systems from a wide range of information needs in the understanding derived from(for example,we need about customers,products,suppliers,sales and processing of the data center),rather than merging many detailed information requested(orders such as a screen or in accordance with the importation of geographical sales summary report).Top-down planning will enable developers()information system,consider system components provide an integrated approach to enhance the information system and the relationship between the business objectives of the understanding,deepen their understanding of information systems throughout the organization in understanding the impact.
Information Engineering includes four steps:(),(),design and implementation.The planning stage of project information generated inforamtion system architecture,()enterprise data model.
问题1选项
A.Down-top planning
B.sequence planning
C.Top-down planning
D.parallel planning
问题2选项
A.to plan more comprehensive
B.to study more comprehensive
C.to analysis more comprehensive
D.to plan more unilateral
问题3选项
A.studying
B.planning
C.researching
D.considering
问题4选项
A.consider
B.study
C.plan
D.analysis
问题5选项
A.including
B.excepting
C.include
D.except

查看答案 纠错
答案: CABDA
本题解析: 暂无解析
更新时间:2021-12-09 19:29

你可能感兴趣的试题

单选题

Advancements in ( )have contributed to the growth of the automotive industry through the creation and evolution of self-driving vehicles.

  • A.Artificial Intelligence
  • B.Cloud Computing
  • C.Internet of Things
  • D.Big Data
查看答案
单选题

In project human resource management , ( )is not a source of power for the project manager.

  • A.referent power
  • B.expert power
  • C.reward power
  • D.audit power
查看答案
单选题

At the project establishment stage , the feasibility study mainly includes techinical feasibility analysis , ( ), operation environment feasibility analysis and other aspects of feasibility analysis.

  • A.detail feasibility analysis
  • B.opportunity analysis
  • C.economic feasibility analysis
  • D.risk analysis
查看答案
单选题

( )is a grid that shows the project resources assigned to each work package.

  • A.Stakeholder engagement assessment matrix
  • B.Requirements traceability matrix
  • C.Probability and impact matrix
  • D.Responsibility assignment matrix
查看答案
单选题

Xinhua News Agency reported in January 2022,Chian will further promote the developmet of a digital economy during the 14th Five-Year Plan eriod(2021-2025). The plan also emphasized industrial ( )transformation.

  • A.digital
  • B.networking
  • C.intelligentize
  • D.informatization
查看答案
单选题

某公司投资一个使用寿命为5年的项目,第一年年初投入1000万元,从第1年到第5年每年年末都有净现金流量300万元。则项目的静态投资回收期为( )年。

  • A.2
  • B.2.5
  • C.3
  • D.3.3
查看答案
单选题

下图是某地的街区网络图(单位:)里),疫情防控期间,一辆消毒车从疾控中心出发,需要消杀所有的街道并返回疾控中心。该消毒车完成消杀工作至少需要运行( )公里 。

高级信息系统项目管理师,历年真题,2022年上半年(上午)《信息系统项目管理师》真题

  • A.43
  • B.45
  • C.46
  • D.48
查看答案
单选题

某公司有东部、中部、西部三个生产基地,生产的产品需要运送带甲、乙、丙、丁四个市场,从生产基地到各个市场的单位运价及产量和需求量如表所示,完成该运输任务所需的最小运费为( )。

高级信息系统项目管理师,历年真题,2022年上半年(上午)《信息系统项目管理师》真题

  • A.242
  • B.244
  • C.289
  • D.302
查看答案
单选题

某炼油厂每季度需供应合同单位汽油15吨,煤油12吨,重油12吨,该厂从甲乙两处运回原油提炼,已知两处炼油成分如表所示,从甲处采购原油价格为2000元/吨,乙处为2900元/吨,为了使成本最低,炼油厂应从甲处购15吨,乙处采购( )吨。

高级信息系统项目管理师,历年真题,2022年上半年(上午)《信息系统项目管理师》真题

  • A.20
  • B.25
  • C.30
  • D.35
查看答案
单选题

某炼油厂每季度需供应合同单位汽油15吨,煤油12吨,重油12吨,该厂从甲乙两处运回原油提炼,已知两处炼油成分如表所示,从甲处采购原油价格为2000元/吨,乙处为2900元/吨,为了使成本最低,炼油厂应从甲处购( )吨,乙处采购20吨。

高级信息系统项目管理师,历年真题,2022年上半年(上午)《信息系统项目管理师》真题

  • A.15
  • B.20
  • C.25
  • D.30