当前位置:首页计算机类软件水平考试初级程序员->阅读以下说明和C代码,填补代码中的空缺,将解答填入答题纸的对

阅读以下说明和 C 代码,填补代码中的空缺,将解答填入答题纸的对应栏内。

【说明】

函数 GetListElemPtr(LinkList L,int i)的功能是查找含头结点单链表的第i个元素。若找到,则返回指向该结点的指针,否则返回空指针。

函数DelListElem(LinkList L,int i,ElemType *e) 的功能是删除含头结点单链表的第 i个元素结点,若成功则返回 SUCCESS ,并由参数e 带回被删除元素的值,否则返回ERROR 。

例如,某含头结点单链表 L 如图 4-1 (a) 所示,删除第 3 个元素结点后的单链表如 图 4-1 (b) 所示。

初级程序员,章节练习,基础复习,案例分析

#define SUCCESS 0

#define ERROR -1

typedef int Status;

typedef int ElemType;

链表的结点类型定义如下:

typedef struct Node{

ElemType data;

struct Node *next;

}Node ,*LinkList;

【C 代码】

LinkList GetListElemPtr(LinkList L ,int i)

{ /* L是含头结点的单链表的头指针,在该单链表中查找第i个元素结点:

若找到,则返回该元素结点的指针,否则返回NULL

*/

LinkList p;

int k; /*用于元素结点计数*/

if (i<1 ∣∣ !L ∣∣ !L->next) return NULL;

k = 1; P = L->next; / *令p指向第1个元素所在结点*/

while (p && (1) ) { /*查找第i个元素所在结点*/

(2) ; ++k;

}

return p;

}

Status DelListElem(LinkList L ,int i ,ElemType *e)

{ /*在含头结点的单链表L中,删除第i个元素,并由e带回其值*/

LinkList p,q;

/*令p指向第i个元素的前驱结点*/

if (i==1)

(3) ;

else

p = GetListElemPtr(L ,i-1);

if (!p ∣∣ !p->next) return ERROR; /*不存在第i个元素*/

q = (4) ; /*令q指向待删除的结点*/

p->next = q->next; /*从链表中删除结点*/

(5) ; /*通过参数e带回被删除结点的数据*/

free(q);

return SUCCESS;

}

查看答案 纠错
答案:
本题解析:

(1) k<i

(2) p = p->next

(3) p=L

(4) p->next

(5) *e = q->data

本题考查 C 语言的指针应用和运算逻辑。

本问题的图和代码中的注释可提供完成操作的主要信息,在充分理解链表概念的基

础上填充空缺的代码。

函数GetListElemPtr(LinkList L,int i)的功能是在L为头指针的链表中查找第 i 个元素,若找到,则返回指向该结点的指针,否则返回空指针。描述查找过程的代码如下,其中k 用于对元素结点进行计数。

初级程序员,章节练习,基础复习,案例分析

上述代码执行时,k 的初始值为1,同时 p 指向第一个元素结点。当找到第 i个元素 结点时,k 应等于 i ,尚未到达第i个结点时,k小于i。因此,空(1)处应填入"k<i" 或其等价形式,使得没有达到第i个结点时继续查找。空 (2)处应填入 "p=p->next", 从而使得指针 p 沿着链表中的结点向第i个结点移动。

函数DelListElem(LinkList L,int i,ElemType*e) 的功能是删除含头结点单链表的第i个元素结点,若成功则返回SUCCESS ,并由参数e 带回被删除元素的值,否则返回ERROR 。

根据注释,空(3)所在语句需要指向第一个结点之前的结点(即头结点),显然此处应填入"p=L"。

空 (4) 所在语句令 q 指向待删除的结点,由于之前已经令 p 指向待删除结点的前驱结点,显然,此空应填入" p->next"。

空 (5) 所在语句通过参数 e 带回被删除结点的数据,由于此时只能通过指针 q 找到 被删除的结点,所以应填入"*e= q->data"。

更新时间:2021-12-07 17:59

你可能感兴趣的试题

单选题

( )is that it provides guidance and direction on how quality will be managed and verified throughout the project.

  • A.Plan Quality Management
  • B.Manage Quality
  • C.Control Quality
  • D.Project Charter
查看答案
单选题

( )the process of determining,documenting,and managing stakeholder needs and requirements to meet Project objectives.

  • A.Plan Scope Management
  • B.Collection Requirements
  • C.Validate Scope
  • D.Control Scope
查看答案
单选题

The information security management system preserves the confidentiality,integrity and availability of information by applying a( ).

  • A.technology management process
  • B.resource management process
  • C.quality management process
  • D.risk management process
查看答案
单选题

( )is a decentralized database,ensure that the data will not be tampered with and forged.

  • A.Artificial intelligence
  • B.Blockchain
  • C.Sensing technology
  • D.Big datA
查看答案
单选题

( )puts computer resources on the web,and must meet the requirements of super capacity,super concurrency,super speed and super security.

  • A.Cloud computing
  • B.Big datA
  • C.Blockchain
  • D.Internet of things
查看答案
单选题

分配甲、乙、丙、丁四个人去完成五项任务。每人完成各项任务时间如表所示。由于任务多于人数,故规定其中有一个人可兼完成两项任务,其余三人每人完成一项。为了花费时间最少,( )应该完成两项任务。

高级信息系统项目管理师,历年真题,2021年下半年《信息系统项目管理师》真题

  • A.甲
  • B.乙
  • C.丙
  • D.丁
查看答案
单选题

已知某公司生产AB两种产品,其中生产1件A产品需要1个单位的甲资源,3个单位的丙资源;生产1件B产品需要2个单位的乙资源和2个单位的丙资源。已知现有甲乙丙三种资源4个单位、12个单位和18个单位。通过市场预测,可知A产品的单位市场利润为2元,B产品的单位市场利润为5元。该公司获得最大的市场利润应生产A产品(68)件,此时(69)资源仍有剩余。

  • A.甲
  • B.乙
  • C.丙
  • D.甲及丙
查看答案
单选题

已知某公司生产AB两种产品,其中生产1件A产品需要1个单位的甲资源,3个单位的丙资源;生产1件B产品需要2个单位的乙资源和2个单位的丙资源。已知现有甲乙丙三种资源4个单位、12个单位和18个单位。通过市场预测,可知A产品的单位市场利润为2元,B产品的单位市场利润为5元。该公司获得最大的市场利润应生产A产品(68)件,此时(69)资源仍有剩余。

  • A.0
  • B.2
  • C.4
  • D.6
查看答案
单选题

某项目2016年投资额12万元,2018年开始取得项目的净收益(产品一原料辅料及公用工程)6万元/年,2018-2021年每年还会产生其他成本(包括人员工资、管理成本、制造成本等)1.1万元/年;増值税0.35万元/年、营业税金及附加0.05万元/年。则该项目的静态投资回收期为(66)年,截止到2021年底该项目的投资收益率是(67)。

  • A.0.25
  • B.0.33
  • C.0.35
  • D.0.6
查看答案
单选题

安全审计的手段主要包括( )。

  • A.①②③
  • B.②③④
  • C.①②④
  • D.①③④
查看答案